The companies CBL Chemobau, Leingarten and the Robert Kieserling Industrieboden GmbH, Hamburg, are installing the KORODUR Industrial Floor for the extension of the Knauf works in Iphofen. Due to the productive capacity of both renowned flooring installers the total flooring volume of around 56,000 m ² will be installed within stortest construction time.
The high quality monolithic reinforced concrete slab is produced with a 10 mm thick hard aggregate topping according to DIN 18560-7. Specified is the product NEODUR HE 65 acc. to DIN 1100-A of Messrs. KORODUR, Amberg. The material is supplied in silo trucks as premixed dry mortar. The daily performance ranges at 1,400m².
On 17/02/05 the first building section of around 32,000 m² could be finished.